Located on the busiest section of Darlinghurst Rd amongst all the bars, clubs and restaurants. This fitout involved challenging task to make this heritage building fire compliant and design and installation of 7 tonne of architectural structural steel to new library floor.

Location:

Kings Cross, NSW Australia

Completion Date:

September 2014

Featured Equipment

1 x Philips Dynalite 12 Channel Ballast (DDBC1200)
2 x Philips Dynalite 12 Channel Relay (DDRC1220GL)
2 x Philips Dynalite 360-degree Sensor (DUS804C)
3 x Philips Dynalite DPN 8 Button Panel (DPN981N)
4 x Philips Dynalite DPN 1 Button Panel (DPN914)
1 x Philips Dynalite Embedded Timeclock (DDTC001)

Related Projects

Let us help you

Full Name
Email Address
Phone Number